Packaging

Packaging materials have to stay dry, and packaging demand moves with your customers' orders. Herchenbach builds Safe+ temporary warehouses that go up on your site in weeks, so you can add storage when a new contract lands. Safe+ is a fully enclosed warehouse with steel walls for goods that don't need temperature control. It keeps out weather, theft, and condensation. We size the building, its doors, and its fixtures to your goods, including large reels and bulky finished stock. Your firm offer, with the timeframe in writing, arrives within 24 hours of the consultation.

150
+
employees
6000
+
completed projects
100
+
years of experience

2,000+ customers in 40+ countries

Here's what customers say about their projects, along with a look at who we build for. Herchenbach projects, Europe.

We were impressed by how fast they responded. When we needed about 53,800 sq ft (5,000 sq m) of non-insulated space at very short notice, we asked Herchenbach for a consultation. Five weeks later, we were using our building.
Sabina G., Plant Manager (Herchenbach project, Europe)
Herchenbach handled the technical details of our building project with ease. Design and assembly of our building of about 10,700 sq ft (1,000 sq m) took only three weeks.
Reinold C., Manager (Herchenbach project, Europe)
Two-span warehouse in under three weeks

For a packaging manufacturer, Herchenbach assembled a two-span temporary warehouse of about 32,300 sq ft (3,000 sq m) in under three weeks, ready to use with personnel doors and fabric roll-up doors for smooth forklift traffic.

Multi-span building with custom dimensions

One customer needed a multi-span building in custom dimensions. Herchenbach's engineers designed more than 107,600 sq ft (10,000 sq m) of warehouse space, and the crew assembled it in five weeks.