Automotive OEMs and suppliers use our temporary warehouses for small parts storage, loading bays, cross-dock space, and vehicle or parts storage. When a program launches or a supplier contract lands, the space has to be ready on the date, and it has to change when the program does. Our modular buildings and short lead times are built for that. Our engineers size the Safe+ warehouse to your application, from doors and docks to lighting and partition walls, and we handle site-specific engineering as part of the work. Tell us the size you need and the date you need it. You'll have a firm, written offer within 24 hours.

150
+
employees
6000
+
completed projects
100
+
years of experience

2,000+ customers in 40+ countries

Here's what a few of them say about working with Herchenbach, and below is a sample of the companies we've built for.

We were impressed by how fast they responded. When we needed about 54,000 sq ft (5,000 sq m) of non-insulated space at very short notice, we asked Herchenbach for a consultation. Five weeks later, we were using our building.
Sabina G., Plant Manager
Herchenbach handled the engineering documentation and every technical hurdle on our project with ease. From design to finished assembly, our building of about 10,700 sq ft (1,000 sq m) took only three weeks.
Reinold C., Manager
Loading bay in a supplier park (Herchenbach project, Europe)

We installed a multi-bay building complex with a loading bay in the supplier park of a Tier 1 supplier. The loading bay has a 16.4 ft (5 m) wide fabric roll-up door. Delivery and complete installation had to be done within five weeks.

Warehouse space in a multi-bay building (Herchenbach project, Europe)

For an automotive manufacturer, Herchenbach built a custom-sized, multi-bay building for warehousing and assembly work, engineered around the customer's layout and workflow.

Mehr erfahren
About 64,600 sq ft (6,000 sq m) of warehouse space in three weeks (Herchenbach, Eu)

While expanding production, the customer needed about 64,600 sq ft (6,000 sq m) of covered warehouse space for semi-finished products, fast. The complete building was assembled within three weeks.