References at a glance

Herchenbach references

In 100 years, Herchenbach has completed more than 6,000 building projects, for mid-size companies and global brands alike. The projects below show how manufacturers and logistics operators use our buildings, and the sizes, doors, docks, and equipment we can build in. Each one started the same way: a company out of space that needed more of it on its own site, on a firm date and at a known cost.

 

Examples

Automotive
Automotive OEMs and suppliers, including Porsche AG and Continental AG, use Herchenbach buildings for parts storage and staging (Herchenbach projects, Europe). Read what they say about working with us.
Find out more
Logistics
Logistics operators use our buildings for overflow storage, cross-docking, and covered loading. Herchenbach has built for customers such as Deutsche Bahn and DHL in Europe. See our logistics projects.
Find out more
Food & Beverage
Many of our customers come from the food & beverage industry. Customers benefit from our cost-effective building solutions, which are also suitable for sensitive goods. Read on for some testimonials from this industry.
Find out more
Packaging
Some of our largest customers are packaging and paper processors, who use our buildings for raw materials, finished goods, and production overflow. See their projects.
Find out more
Other sectors
We also build for other manufacturing and distribution operations. The modular system adapts to a wide range of uses.
Find out more

2,000+ customers in 40+ countries

Here's what a few of them say about working with Herchenbach, and below is a sample of the companies we've built for.

Herchenbach's project management was first-class. Every milestone and budget was met or beaten, and the building impressed us with its durability and quality, right down to the last detail.
Jan P., Manager
Our company needed dry warehouse space at short notice for large quantities of raw paper. Herchenbach handled the project from start to finish, on time and under budget. The employees found suitable solutions for our requirements.
Olaf K., Plant Manager
We were impressed by how fast they responded. When we needed about 54,000 sq ft (5,000 sq m) of non-insulated space at very short notice, we asked Herchenbach for a consultation. Five weeks later, we were using our building.
Sabina G., Plant Manager

Other topics

Services
Everything we handle, from consultation to teardown
One contact from signature to sign-off.
Find out more
Building locations
Where we've built
See a map of Herchenbach buildings we've installed
Find out more
Further information
Go to our downloads section
Download brochures and product information.
Find out more