Our building sizes

How to I determine the right building size?

The goods being stored are key to deciding the right building width and length, as is the purpose of the temporary building. When storing goods, potential manoeuvring distances of forklifts or similar vehicles must be taken into consideration. We will help you calculate the right building width and length and can visit your premises for a personal consultation to determine your requirements.

Clear span width Eave height Ridge height
16.4 ft (5 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 13.8 ft (4.22 m) / 17.1 ft (5.22 m) / 20.4 ft (6.23 m) / 23.7 ft (7.23 m) / 27.0 ft (8.23 m)
24.6 ft (7.5 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 15.2 ft (4.62 m) / 18.4 ft (5.62 m) / 21.8 ft (6.63 m) / 25.0 ft (7.63 m) / 28.3 ft (8.63 m)
32.8 ft (10 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 16.5 ft (5.03 m) / 19.8 ft (6.03 m) / 23.1 ft (7.04 m) / 26.4 ft (8.05 m) / 29.7 ft (9.05 m)
41.0 ft (12.5 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 17.8 ft (5.43 m) / 21.1 ft (6.43 m) / 24.4 ft (7.43 m) / 27.7 ft (8.45 m) / 31.0 ft (9.45 m)
49.2 ft (15 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 19.2 ft (5.84 m) / 22.4 ft (6.84 m) / 25.8 ft (7.85 m) / 29.0 ft (8.85 m) / 32.3 ft (9.85 m)
57.4 ft (17.5 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 20.5 ft (6.24 m) / 23.8 ft (7.24 m) / 27.0 ft (8.24 m) / 30.3 ft (9.24 m) / 33.6 ft (10.24 m)
65.6 ft (20 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 21.8 ft (6.65 m) / 25.1 ft (7.65 m) / 28.4 ft (8.65 m) / 31.7 ft (9.65 m) / 34.9 ft (10.65 m)
82.0 ft (25 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) / 24.3 ft (7.4 m) 24.5 ft (7.46 m) / 27.8 ft (8.46 m) / 31.0 ft (9.46 m) / 34.3 ft (10.46 m) / 37.6 ft (11.46 m)
98.4 ft (30 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) 27.1 ft (8.27 m) / 30.4 ft (9.27 m) / 33.7 ft (10.27 m) / 37.0 ft (11.27 m)
114.8 ft (35 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) 29.8 ft (9.09 m) / 33.1 ft (10.09 m) / 36.4 ft (11.09 m) / 39.7 ft (12.09 m)
131.2 ft (40 m) 11.2 ft (3.4 m) / 14.4 ft (4.4 m) / 17.7 ft (5.4 m) / 21.0 ft (6.4 m) 32.5 ft (9.90 m) / 35.8 ft (10.90 m) / 39.0 ft (11.90 m) / 42.3 ft (12.90 m)

Questions about building sizes

There's no limit. The building can be as long as you need, in steps set by the bay spacing. Depending on the engineering for your site, bays are 13.1 ft (4 m) or 16.4 ft (5 m) apart, so the length is a multiple of one of those. 

 

Yes. Our standard modular system uses eave heights of 11.2, 14.4, 17.7, and 21.0 ft (3.4, 4.4, 5.4, and 6.4 m), lengths in steps of 13.1 ft (4 m) or 16.4 ft (5 m), and single-span widths from 16.4 to 131.2 ft (5 to 40 m). When you need a size outside that range, our engineers design and calculate it for you. We're glad to visit your site to work through the options.

 

 

Building width is measured from the center of one column to the center of the opposite column. Clear width is the open space between the columns, measured at their inside edges. For the total footprint, allow for the anchor plates and for a possible shift in column centers of up to 5.5 in (14 cm). Our widest anchor plate adds about 28 in (71 cm), so plan on adding up to about 33.5 in (85 cm) to the building width.  

 

Yes. A single span goes up to 131.2 ft (40 m) wide. For anything wider, we join spans side by side.

Yes. In a multi-span building, each span can have its own width (up to 131.2 ft (40 m)) and length (in steps of 13.1 ft (4 m) or 16.4 ft (5 m)). Our engineers work with you to lay out a building sized to your operation.

 

Yes. A temporary warehouse can connect directly to an existing building. How far it has to sit from other buildings depends on your local fire and building codes, and a fire-rated roof can shorten that distance. Our Heba-Dach+ roof fabric resists heat and flying sparks, which lets the building go up right next to a permanent one.

 

Yes. A Herchenbach building can go up on a slope of up to 1.5% with no changes, because the slope is built into the engineering. On steeper ground, our engineers calculate an adjustment to the columns for your site, so the building goes up level and sound.

 

Wind and snow loads depend on where the building goes, and every Herchenbach building is engineered for the loads at your site. The expected snow load sets the frame profile, and the wind load sets the type and number of ground spikes or other anchoring. We handle this site-specific engineering as part of the work. Our buildings are rated for wind loads up to about 20.9 psf (1.0 kN/m²) and snow loads up to about 28.2 psf (1.35 kN/m²).