Warehouse for the Construction Industry

Order books are full, and so are warehouses. In the construction industry, space requirements arise precisely when there's no time to think about it. A modular warehouse from Herchenbach can be erected in a week and offers space for all tools and small parts.

A construction company in Oldenburg had run out of space for tools and small parts. Their next project was already scheduled, but they lacked the necessary space. A traditional new building wasn't an option. Herchenbach delivered a 502 m² Safe+ warehouse, ready for operation before they ran out of room.

These companies trust Herchenbach

Make space. Operations continue.

The Safe+ hall was integrated directly into the existing site without interrupting ongoing operations. Tools and small parts have their designated place before the next project begins.

Everything at hand.

A cantilevered surface without internal supports. No searching, no rearranging. What's stored is immediately available for the next use.

Are you planning a similar hall project?

Get advice on Warehouse-as-a-Service solutions from Herchenbach.

Further hall references

Dry storage of wood for ZEG
The 1600 m² double-aisled, prefabricated warehouse for the timber trade was assembled in 10 days.
Learn more
Multi-bay halls for MAN Energy Solutions
Over the past 5 years, we have assembled 7 new hall projects for MAN Energy Solution with a storage area of ​​over 4500 m².
Learn more
Cold storage building as weather protection for material storage
A hall measuring over 2000 m² with wall cladding made of trapezoidal metal sheets was built for Gutmann Bausysteme GmbH.
Learn more